Louisville Kitchen Remodel Cost Guide

Most full kitchen remodels we build run about $50,000 to $80,000. These are real numbers from kitchens Kentuckiana Property Solutions built in 2026, not national averages.

Type of kitchenWhat it usually includesTypical cost
Refresh or cabinet refacingRefaced or refinished cabinets, new counters, backsplash and hardware; same layoutAbout $20,000 to $40,000
Full remodelNew cabinets, counters, plumbing and electrical updates, flooring, permitsAbout $50,000 to $80,000
Fully customCustom-built cabinets, moved walls, high-end appliancesPast $100,000

These ranges come from the signed prices of three recent KPS kitchens, from a mid-range remodel to a fully custom one. Your mix depends on your layout and selections.

Part of the jobTypical share of the price
Cabinets and installation30% to 50% (up to 65% for fully custom cabinets)
Countertops and backsplash10% to 20%
Plumbing and electrical8% to 18%
Flooring and paint5% to 15%
Demolition, framing and drywall5% to 15% (higher when walls move)
Everything else (permits, fixtures, cleanup)About 5% to 10%

The takeaway: cabinets are the biggest lever. Choosing stock, semi-custom or fully custom cabinets moves the price more than anything else.

Most full kitchens take 3 to 6 weeks, depending on scope, layout changes and the permit process. A refresh can be shorter. You get a written schedule on day one and can follow along as each step is done, so you know which weeks you’ll be without water or a stove.

Most kitchens that move walls, plumbing or wiring need permits and inspections. Your contractor should pull them, not you. Ask any contractor for their Louisville Metro license number and check it on the city’s license lookup. Ours is LIC-GBCL-24-00003.

The biggest budget worry is selections: cabinets, counters, tile, fixtures and lighting. At KPS, every selection gets a clear allowance in your written price before work starts.

  • You see what fits your allowance and what costs more, side by side.
  • If something you love costs more than you expected, you’re never locked in. We’ll help you find an option in your range.
  • Or you can choose to upgrade, knowing the exact difference before anything is ordered.

Ask any contractor you’re considering: “What allowance is included for each selection, and what happens if I choose something different?” A clear answer is a good sign.

  1. Comparing bids that aren’t apples to apples. A low bid often leaves out permits, electrical updates or realistic allowances. Ask what’s included, line by line.
  2. Skipping the layout plan. Moving a sink or wall after work starts costs far more than planning it up front.
  3. Picking cabinets last. Cabinets are 30% to 50% of the cost, and up to 65% for fully custom, and can take weeks to arrive. Choose them early.
  4. Low allowances that hide the real price. A cheap bid with tiny allowances can end up costing more. Make sure allowances match what you actually want.
  5. Hiring without a license or permits. Unpermitted work can cause problems when you refinance, insure or sell.
  6. No written schedule. Without one, you can’t plan meals, holidays or guests around the project.
  7. Not asking how surprises are handled. In an older home, nobody knows what’s behind the walls until they’re open. Sometimes it’s fine, sometimes it isn’t. A good contractor won’t guess and pad your price for it. If something comes up, we stop, show you what we found and why it needs attention, and give you the cost in writing. Then you decide whether to do it.

Financing is available through HFS, with 0% options through Synchrony, for qualified buyers and subject to credit approval. Every KPS kitchen comes with an 18-month written workmanship warranty.

Schedule a visit and we’ll walk your kitchen, talk through your goals, and give you a written price with clear allowances. We call you back within one business day. Prefer to talk now? Call (502) 709-6965.

Kentuckiana Property Solutions is a Louisville-based custom design-build remodeling team for families planning a major kitchen, bath, basement or addition project, especially good for larger and whole-home remodels because one team handles the design, permits and build on a written schedule.