A Jeffersontown kitchen rebuilt around a busy young family

Finished sage green kitchen in Jeffersontown with tall pantry cabinets, quartz peninsula and pendant lights

Kitchen remodel · Jeffersontown, KY. A cramped layout with a window in the wrong place became a full working kitchen, a peninsula that seats four, and a hidden drop zone by the garage door.

  • Area: Jeffersontown (40299)
  • Project: Kitchen layout change, garage-entry drop zone and staircase
  • Structural: Wall moved about 15 inches; window removed and sided over
  • Investment: About $66K
  • Time on site: About 6 weeks
  • Team: KPS design-build team: design, permits and build

This Jeffersontown family has young kids and was fighting for every inch of space. The old kitchen had a window where the cooking wall needed to be, the stove sat tight against a wall with nothing beside it, and the entry from the garage was a half wall with no real storage. Everyone came in from school or work and dropped their things on the counter.

They also started with a different picture of the kitchen than the one we ended up building. We kept working through the design with them until everyone was happy with it.

  1. Moved a wall out about 15 inches. That small move gave the range and cabinets the room they needed.
  2. Took out the window. Combined with the new wall, that freed up a complete cooking wall. We patched the outside with new siding, so you can’t tell a window was ever there.
  3. Turned the peninsula. Its new angle opens the room and gives four people a place to sit together.
  4. Built a drop zone by the garage door. The old half wall became a full wall with custom cubbies, shoe storage and a bench, all behind cabinet doors so the clutter stays hidden.

“We had a completely different vision for our kitchen, and Richard worked with us until he was happy with it, and we were happy with it, and it ended up way better than I had thought it could be.”

Jeffersontown homeowner

Opening up a wall and removing a window means working inside the walls, and nobody knows exactly what’s in there until they’re open. When something comes up, we stop, show you what we found and why it matters, give you the cost, and you decide. The homeowners told us they valued that: “They would fix anything until it was perfect.”

While we were there, we rebuilt the front staircase. The carpet came off, and we replaced the entire handrail and newel post with a craftsman-style design. The railing and treads are solid red oak, which we stained and sealed, with white risers and iron balusters.

“I really appreciated how they communicated with us, and the pride that they took in their work. They would fix anything until it was perfect, and I really appreciate that, because I’ve just heard horror stories from other contractors just kind of leaving you. I have nothing but good things to say, and we’ll definitely use them again in the future.”

Jeffersontown homeowner

Let’s sit down and talk about how your family uses the room. Most KPS kitchens take 3 to 6 weeks on site, depending on scope.